It
is always important to note with whom you are
dealing in contracts. It used to be very simple
to know that the buyer was a contractor/installer.
Today, however, with everyone trying to save
money, the buyer could be the owner, the general
contractor, the architect/designer, an importer,
a distributor, or even an agent. In this article
we will assume the buyer is the contractor/installer.
There
are several phases in the bidding process. Many
times initial bidding requests are for purposes
of investigation and pricing only. Thus, there
is no intent to buy the stone. The purpose is
to estimate the job's cost, including alternative
material costing.
Many times there are not complete plans on the
job or many details are missing. These speculative
bids are common. The evaluation of this costing
is then presented to the owner to study whether
or not it is within budget and affordable overall.
Many times the job allows other materials for
comparison, wood flooring, stone, ceramic, or
carpeting. After further investigation the job
is then redesigned. Sometimes value engineering
is required, and the job will be out for bid
again in several months. Value engineering means
that they are going to study the costs and see
what can be done to cut costs in various areas
with a subcontractor's input.
Therefore, it is important that you ask questions
when bidding such a job and try to understand
the situation. Perhaps you can offer a voluntary
alternate, a suggestion on how to cut costs.
You should be prepared to follow up at a later
date and keep abreast of this job and its progression.
When
an architect has selected a stone, he normally
has not investigated all the costs attributed
to this stone. He uses general numbers that
have been supplied to estimate budgets for the
owner on what previous jobs have cost or what
it should run based on a sales representative
number for the stone. However, there are many
variables to consider.
What is the current exchange rate for the stone
being bought? When will the stone be needed?
Many times you can bid a job today, but the
stone will not be needed for a year or more.
What thickness, size, and finish of stone are
required and how does that affect the estimated
costs originally given the architect? The architect
may have been given a budget cost on 30cm x
30cm x 2cm honed, and the job now requires fifteen
other sizes, some parts honed while others are
flamed or textured finish.
What is the installation method and what costing
was allowed for this? Whether the job is interior/exterior
or floors/walls will affect the costs. It is
important before giving out estimated costs
that the architect give all proper information
to the right parties to get the right estimates.
So many times this is not the case, and the
job is over budget.
The job may require some cutting at the job
site, or the stone may require repair if it
arrived damaged. Too many times all parties
concerned are not knowledgeable of the stone
and the problems that may occur. Architects
and contractors may treat the job like ceramic
tile and pray there are no hidden problems that
may arise.
The
normal bid process follows several stages. The
architect and owner may select a general contractor
or may put the bid out for general contractors
to bid. Each general contractor will have a
select group of subcontractors or installers
he will request bids from in order to take their
lowest bid.
A typical job may have as many as ten general
contractors bidding and, in turn, thirty subcontractors
bidding it. These subcontractors may be ceramic
tile setters, marble setters, mason contractors.
etc. Generally, the lowest bidder will get the
job. There are variables to this that must be
considered, such as:
1.
Was a specific stone and supplier specified
in the bid documents? If you were that
supplier, you will stand a better chance
of getting the job. However, you must
know whether or not the architect controls
this with the general contractors and
subcontractors. Many times there is
no control, and the supplier will be
shopped for lower prices. In certain
states general contractors will take
the supplier's name off the bid documents
to the subcontractors as they do not
allow lock or closed bids for competitive
reasons. In these situations, the general
contractor may demand similar stones
be quoted to lower the cost whether
the architect agrees or not. One ploy
that many suppliers use is to change
the name of the stone in order to make
it harder for others to bid the job
easily.
2.
Was an alternate stone specified or
are alternates allowed either by demand
or voluntarily? Many times the suppliers
can offer other suggestions to lower
the costs and make their bids more competitive.
If in doubt, offer alternates voluntarily.
Perhaps you can state "if done in this
recommended size or thickness, the cost
could be lowered to . . . ." Is there
another stone similar to what the architect
or buyer wants that may be less expensive?
3.
When will the stone be required for
the job? Some jobs are fast track, meaning
stone will be needed within 90 days
or less. Other jobs require shop drawings,
sample submissions, and mock ups for
approval, so the time could be nine
months to a year or longer before the
job requires stone. This can affect
any supplier's costs. Immediately on
receipt of the request for a bid, ask
the buyer questions about the job. The
more you know, the better. The supplier
should know that the stone may not be
required for one year, what his labor
costs are, whether ocean freight will
be rising in that period, and what potential
exchange rates are. In order not to
raise costs, he may offer to purchase
the stone in advance and store it.
4.
What terms of payment are you offering?
Many buyers require open account or
payment terms, and others are willing
to pay by letter of credit but want
60 day terms. Everyone is trying not
to use his own money to finance this
job. The typical contractor is not paid
until after installation and this could
take months. Always qualify your bid
with payment terms at the time of bidding
so no misunderstandings are made. This
many times requires the supplier know
to whom he is bidding and the credit
worthiness of the buyer. Offering qualified
buyers incentive terms of payment many
help a supplier get the job. The mentality
with buyers is they do not like to work
with letters of credit. There are other
secure methods of payment that could
be negotiated.
5.
It is important to advise the buyer
of the lead times required to supply
the stone as this may push the buyer
to purchase sooner. Many problems have
occurred because when the buyer was
ready to purchase, there was not enough
time to make it and bring in onto the
job site, so another stone will be used
or none at all. Always qualify this
at the time of bidding. If you can offer
a quicker lead time or better availability
of the stone, you may improve your chance
of getting the order.
6.
Advise the buyer of potential problems
with the stone and variations. This
should never be taken for granted. The
buyers or the architects may not know
the variations as the stone was selected
from a 10cm square sample. If there
is to be variation, explain this verbally
and in writing as best you can with
color descriptions, veining, shading,
spotting, pits or holes, seams or cracks,
etc. Many jobs have been lost because
no one knew of the problems or variations.
7.
Know your buyer. The best result of
successful bidding is to know whom you
are dealing with. Having a relationship
with the buyer and knowing how he works
is important. As well, you should know
the job and know who the players are
before bidding it. Many jobs have been
lost because the supplier depended on
an importer or a contractor only to
find out the general contractor was
not the low bidder that his contact
was working with, and he lost the job
because he did not quote other parties.
How much profit each buyer puts on the
stone may vary from 15% to 30% or more.
Jobs are lost not because your price
was high but because your buyer's price
was high. Those who are aggressive normally
will have a higher success rate of getting
contracts.
8.
Know the selection and variation the
architect is willing to accept. Jobs
are won and lost on this point. Some
jobs are specified as a general term,
such as "Rosa Porrinho," but do not
state which quarry or which selection,
light, medium, or dark or whether seconds
are allowed. Prices can vary from supplier
to supplier based on this. The variation
in price can be as much as 35%. If in
doubt, qualify your bid and give the
lowest price but state your selection.
Most times the buyer will use your price
and qualify his bid to show this selection.
It is usually understood by all buyers
that they will receive first quality
stone, but this is usually a terminology
that applies to workmanship and not
selection. Not all buyers understand
the stone and the selection, and it
is the supplier's job to tell them what
they are quoting at the time of the
bid.
9.
Follow up on the job. Set time frames
for when you will fax or call or visit
the buyers and see what it is that they
require to get or close the job. The
mentality in the U.S. is persistence
and service. People like to know that
a supplier will support them and react
quickly. When a bid is requested, respond
the next day with a price.
The
bidding process is very quick. Typically the
architects will release the drawings to the
general contractors and advise them they have
two weeks or one month to make their proposals.
Then the general contractors release these drawings,
with a fee, to a potential subcontractor. These
subcontractors have to go through a mountain
of paper work to do a take off of the job and
estimate the work to be done.
This may take a week or two. They are then in
a position to ask the suppliers for a quote.
This may only allow the suppliers two days or
so to respond with prices.
On
the bid date give your prices to the subcontractors
in the morning. Buyers ask for prices for the
previous day but many times do not receive them
until the morning of the bid day. Some general
contractors will have favored subcontractors
with whom they are confidential and show them
other bids in hopes they will lower their bid
and give them an advantage over others.
After the general contractor is selected, usually
because he has the lower price, everyone waits
for the contracts to be signed assuming no changes
in design are made. This process may take months
before final negotiations of the subcontractors
will take place. The general contractors may
start again shopping the subcontractors to see
how they can improve their profit on this job.
The subcontractors may start shopping their
suppliers to lower prices. Everyone starts negotiations.
Even alternates to the stone specified may be
studied. Usually within two weeks of the bid
date the buyer can find out who was the successful
low general contractor and whether his price
to that general contractor was low enough to
have a chance of getting this job.
Some
suppliers have tried to bypass this process
and go directly to the general contractor or
the owner to see if they can cut someone out
and save the owner money by buying directly
from the supplier. This may sometimes work or
may upset your relationships with the subcontractors.
Everyone must make this decision sooner or later
and know again who the players are.
It
is always helpful for the suppliers to promote
their products through architectural representatives
directly to the architect. The selection process
for the stone is important and allows the supplier
to have advance notice of bids and to know the
job and other information that his competitors
may not know. Inviting architects to visit your
quarry or facilities and help pay some of their
expenses is always a good idea. It is an investment
in the future.
Offering
technical data on the stone and supplier qualifications
is always helpful. Offer A.S.T.M. test data
on your stone. Show the buyer how much better
your stone is than an alternate stone being
considered. Know the application for the stone
and assure the buyer your stone will be suitable
for the use specified.
A supplier must constantly sell himself to buyers
and show they are qualified to supply jobs,
especially those more difficult than the customary
60 cm square pavers. A supplier should always
have a form pre-prepared to fax or mail out
with his bid showing expertise, testing of the
stone, jobs done similar to the one being quoted,
how he controls this stone, if possible, or
any other selling points that will distinguish
him from other bidders.
Finally,
be prepared in advance to offer the buyer a
discount. All buyers like to know they can negotiate
and get lower prices and assistance from their
suppliers. The successful suppliers will offer
the buyer 5% or 10% or more when requested to
help get the job even though this discount may
have been built into the price at the time of
quoting.
Recently with the devaluation of the peseta
by Spain at 8%, many suppliers faxed immediately
and told perspective buyers of this opportunity
which effectively lowered the costs and made
it affordable for all parties concerned.
Contractors
come in all shapes, sizes, and mentalities.
The game of bidding a job and getting the job
can be quite complicated as there are so many
players and different types of people. What
works in western Canada may not work in New
York or Atlanta and is completely different
for Mexico.
Communication is most important and knowing
the game and the players will help you win in
negotiations.
By
Mr.JEFFREY MATTHEWS
About
the Author :
He is President of Trade
International, Inc., a dimension stone marketing
and consulting corporation. He established Trade
International, Inc. in 1985. Mr. Matthews has
been in the stone business over 25 years. First,
as a managing director of a large import firm,
importing and distributing dimension stone,
as a buyer. He has had extensive experience
in traveling to over 25 countries to study and
procure stone. He has promoted stone and its
use to various industries such as commercial
residential contracting, distribution, retailers,
furniture manufacturers, trophy bases, lighting
and other related fields.
Mr. Matthews has served on the board of directors
of the Marble Institute of America and has held
a position as an officer including President.
He is also a member of A.S.T.M., and other organizations
which promote the education and use of stone
to the industry. He has been active in the organization
of the Marble Institute of America Color Plate
Book and has served on various committees of
the M.I.A.
He periodically has given seminars on stone
at the Marble Institute of America, I.T.E. shows,
and for the Greek Consulate